Author Archives:
Fat Angel is Open!
As I sit at the bar on a Friday night at 2am, after everyone’s gone, the floors swept, the last rack of dishes clean, I can’t help but think that the opening of FA last week was a complete miracle. More than one customer has mentioned that from the looks of things 2 weeks ago [...]
Multimedia message
The fat angel has taken her spot in the lights. A fitting home for our special baby.
Multimedia message
Finished product. Looks really good
Multimedia message
New Bohemia Signs putting the finishing gold leaf touches on our front door logo.
Multimedia message
Some friends helping with the final touches for FA's February 1st opening. Tin ceiling is getting a well deserved rub down
Final Touches
We’re nearing the end of what’s proven to be a very challenging 2 years. We knew the minute we signed up to open an eating and drinking establishment in SF that we hopped in a boat sailing up-river, against prevailing winds, using a hanky for a sail. In most instances, the pitfalls we thought were [...]
Multimedia message
Preparing the storefront for next weeks awning and Angel Box install. All starting to come together albeit 3 months behind. We're hoping next week will be the final push for the finish line. We're shooting for 3 weeks until we open. Pulling Wall construction kicking an screaming all the way there. -jk
More improvements
I’m not going to spoil this one. J and I are working on another improvement to our bar. Here’s a glimpse of what’s to come. J “the mad scientist” Kirmse working our project with only reclaimed materials. Keep the WORLD GREEN people.
Did someone order a metal frame?
It’s amazing how these guys can move such a large piece of metal that weighs nearly half a ton, and they’re only working with inches between a wall and a car. Here’s a couple of shots and videos of the box frame. The box arrives. It still needs to be painted. The easy part is [...]
Multimedia message
Angel frame has arrived. 1000 lbs. We're praying it fits










